Planning a kitchen renovation?

Know what goes behind your new kitchen, before it’s covered up

Most of a kitchen’s quality is hidden once it’s finished: the fixings, the cables, the pipes. Watch a real fitted kitchen being built in 3D, in the order your fitter will build it, and see what to check at each stage.

  • 9 stages, in build order
  • 11 checks before it’s hidden
  • Sourced to regulations and makers
The fitted kitchen model, with its cabinets, worktop and appliancesInteractive 3D model

The order it goes in

Each stage hides the one before it. Knowing the order tells you when to look, and when it’s too late to ask.

  1. The kitchen at stage 1: the walls are framed1

    The walls are framed

    In a stud wall, the steel studs go up first, with plywood fixed between them wherever wall cupboards will hang, and steel noggings where sockets and switches will go.

  2. The kitchen at stage 2: first fix: pipes and cables2

    First fix: pipes and cables

    The water main, hot and cold supplies, waste and every cable are run inside the walls and floor, to the points the kitchen plan needs.

  3. The kitchen at stage 3: the walls are boarded and skimmed3

    The walls are boarded and skimmed

    Plasterboard goes on over the frame and services, then a skim of plaster. From here on, what's inside the wall can't be seen.

  4. The kitchen at stage 4: base and tall cabinets4

    Base and tall cabinets

    Each base cabinet is pushed back to the wall, levelled on its legs and screwed to its neighbour. The tall cabinets for the oven and fridge-freezer go in with them.

  5. The kitchen at stage 5: wall cabinets5

    Wall cabinets

    Wall plates are screwed through the board into the plywood behind. Each cabinet hooks on to its plates, then is levelled and drawn tight to the wall.

  6. The kitchen at stage 6: worktop, sink and hob6

    Worktop, sink and hob

    The worktop goes on the cabinets first. An undermount sink is fixed up underneath it, then the tap, waste and the hob in its cut-out.

  7. The kitchen at stage 7: appliances, tiles and lights7

    Appliances, tiles and lights

    The appliances slide into their housings, the extractor goes in its wall cabinet with its duct, then the wall tiles and the under-cabinet lights.

  8. The kitchen at stage 8: doors, plinths and floor8

    Doors, plinths and floor

    Doors are clipped on and their hinges adjusted, handles last. Then the plinths and the floor tiles up to them.

  9. The kitchen at stage 9: second fix9

    Second fix

    Sockets, switches and outlets go on their boxes, and the appliances are plugged in or wired to their outlets.

Watch every step in 3D, with captions →

Check it before it’s covered up

These are the things a finished kitchen won’t show you. Each one is in the 3D model, so you can see what good looks like before you check your own.

0 of 11 checked

After stage 2

Before the walls are boarded

  • Something solid behind every wall cupboard

    Plasterboard alone won't hold a loaded wall cupboard. In a stud wall there should be plywood or timber between the studs across the whole band where the cupboards will hang.

    Howdens wall cabinet installation manual (fixing to the wall)Pattressing and noggings →

  • Cables only where they'd be expected

    Hidden cables should run straight across, or straight up or down, from a socket or switch. In a metal stud wall the circuits also need 30 mA RCD protection.

    BS 7671 522.6.202 and 522.6.204Sockets and switches →

  • No sockets or switches right by the sink

    Keep them at least 300 mm from the sink and drainer, and fixed to the wall rather than inside a cabinet, so they can be reached once an appliance is pulled out.

    IET Electrician's Guide to the Building Regulations 5.2.2; NHBC Technical Guidance 8.1/22

  • The oven's own circuit, if it needs one

    Check the oven's spec sheet. Many built-in ovens have no plug: the one in the model draws 16 A and runs on its own 20 A circuit with a double pole switch. A new circuit is notifiable work in England, so it should be done by a registered electrician.

    Neff B64CS51G0B spec sheet and installation instructions; Approved Document P

  • Water and waste where the sink will be

    Hot and cold should come out where the sink base will sit, and the waste should fall at least 18 mm in every metre on its way to the soil stack. Ask where the stopcock will be: in the model it sits in the sink cupboard.

    Plumbing →

After stage 5

Before the worktop goes on

  • Base cabinets level and fixed together

    Each cabinet should sit level on its legs and be screwed to the one beside it. A worktop laid over cabinets that aren't level will rock or crack.

    Howdens cabinet installation manualsBase units →

  • Wall cabinets level and tight to the wall

    Each hanging bracket has two adjusting screws: one for level, one to pull the cabinet back to the wall. There shouldn't be a gap behind it.

    Wall cabinets →

  • Switches you can reach without pulling anything out

    Each built-in appliance should be switched off above the worktop, so it can be isolated without being dragged out. In the model, one plate above the worktop holds all six switches.

    Sockets and switches →

After stage 7

Before the plinths go on

  • Valves you can reach from the cupboard

    Under the sink there should be an isolating valve on the hot and on the cold, so the tap can be changed without draining the system, and every joint should be reachable.

    Sink →

  • The dishwasher's hoses

    The drain hose should loop up high before it joins the waste, so dirty water can't siphon back. Run the dishwasher once and look for drips before the plinth hides them.

  • The extractor's duct

    The duct should be connected to the hood and run to where it vents, held up on clips rather than left resting on the ceiling.

    Extractor →

A guide to what to look for, not a substitute for your building control officer or a registered electrician.

See it for yourself

Turn it, pull it apart, and tap any part to see what it is and how it’s specified.

Open the kitchen in 3D

Renovating more than the kitchen?

A new part of the house goes up in 3D most weeks: walls, doors, extensions, bathrooms. Get each one by email, with what to check before it’s hidden.